Lean Transformation for Airplane Fan Blade Repair and Overhaul


Industry: Aerospace

Company Size: < 10,000 employees

Ownership: Private Equity

The Challenge:

Batch‑and‑queue processes, excessive WIP, poor material flow, and weak scheduling drove long cycle times and missed delivery targets in a high‑margin business.

  • Value Stream Mapping: Identified bottlenecks and incapable processes.

  • Future State Design: Developed greenfield and brownfield concepts with simulations.

  • One‑Piece Flow: Transitioned from batch processing to takt‑based flow.

  • Lean Training: Built foundational Lean capability across leadership and operations teams.

Our Approach:

  • 40% reduction in order‑to‑ship cycle time

  • 95% on‑time delivery

  • $5M reduction in WIP inventory

  • Greenfield facility recommendation (opened December 2024)

The Results:

Why It Matters

Streamlined production improves delivery performance, reduces cost, and enables scalable growth in a competitive aerospace market.

Services & Tools: Value Stream Mapping, Kanban, Visual Management, Lean Layout, 3P, Material Flow Simulation, Lean Training, A3 Problem Solving


Previous
Previous

Fleet Utilization Improvement Delivers $13M in Cost Savings